How do I replace a data integration tool without a big-bang cutover?

The risky part of replacing an integration tool is not the new tool. It is the weekend you switch everything at once and find out on Monday that three pipelines were quietly dropping rows. Dual-run removes the weekend.

Run both tools against separate targets, prove the outputs agree, then retire the old pipeline one group at a time. Bridge supports the three things this needs: generating a pipeline set in bulk, verifying agreement with row counts and file hashes, and moving the proven configuration between environments.

1
Pipeline group retired per cut-over, never the whole estate
2
Verification methods: row-count reconciliation and MD5 file hash
3
Import outcomes reported: succeeded, skipped, failed
2
Table-creation policies: keep existing, or drop and recreate
Five phases

The dual-run shape

Five phases, and the ordering matters more than the calendar. The mistake is treating cut-over as the milestone; the milestone is a reconciled comparison, and cut-over is what you do afterwards.

A dual-run cut-over in five phases.
PhaseWhat runsExit criterion before moving on
1 · Bulk buildGenerate the pipeline set from the source table list, one target table plus one job per source tableEvery table in scope has a target, a mapping and a schedule
2 · Dual runThe incumbent tool writes to target A; Bridge writes to target B, on the same scheduleBoth targets advance together for at least one full business cycle
3 · ReconcileRow counts compared per table through receipts; file outputs compared by hashEvery table within tolerance, and every exception named and explained
4 · Cut overConsumers repoint to target B, one pipeline group at a timeNo new writes reach target A
5 · RetireOld jobs disabled after the retention windowTarget A retained read-only as the rollback path

Phase two is where projects lose patience and skip ahead. A single full business cycle is the minimum, and if your volume has a month-end or quarter-end shape, the cycle has to include one of those — a dual run that only ever saw mid-month traffic has not been tested against the shape that breaks pipelines.

Two methods, two blind spots

Counting rows is not the same as comparing content

Row counts are the cheapest check and the weakest one. They catch missing data and completely missed tables; they do not catch duplicates, mis-mapped columns or truncated strings, because those keep the count intact. Use two methods with different blind spots.

Verification methods and their blind spots.
MethodWhat it provesWhat it misses
Row count per tableThe expected number of rows arrivedDuplicated rows, swapped columns, truncated values
Row count per step, with reconciliation receiptsWhere in the flow the counts diverge, not just that they didColumn-level corruption inside a correctly sized result
MD5 file hash, both sidesThe transferred file is byte-identical to the source fileDatabase targets, where there is no file to hash
MD5 hash, single sideThe target matches a hash produced outside the platformRequires the source-side hash to exist before the run

Reconciliation needs one piece of preparation that is easy to forget: a receipt database and receipt table must exist and be declared as a data connection before reconciliation can run. Today that receipt store is a MySQL database, so choose it deliberately rather than assuming the target warehouse can hold its own receipts. Counts are captured by statistics components placed upstream of the save step, and each captured step becomes a line in the reconciliation list.

Prerequisites

Hashes need plumbing, not magic

File verification is a tool with prerequisites, and knowing them changes the plan. It compares file content after a transfer by computing MD5 on each side and comparing the values.

Emit the file inventory first

A file-copy plus text-line-output transformation records the source path and the target relative path for every file, into a CSV or text file.

Both endpoints need access

SSH2 data connections are required for the source and the target file servers, configured as ordinary data connections.

Linux and Windows only

File verification supports those two operating systems; a Windows endpoint needs an SSH server installed before the check can run.

Results land in a table

Single-sided checks compare the target hash against a hash you already hold and write the result to a named result table, so the outcome is queryable rather than a green tick on a screen.

That last point is the one to insist on in a review. A verification step whose output is a colour on a dashboard is not evidence; a row in a result table is.

Archive, not push

Promotion between environments, and its one sharp edge

Proven configuration moves between environments as an archive, and the import is not a blind overwrite.

Archive-based promotion between environments.
StepWhat happensWatch for
ExportSelected resources, or everything, are written to a .dat archive and downloadedExport covers data connections, transformations, jobs, batch jobs and template batches
Import orderConnections first, then transformations, jobs, batch jobs and template batchesThe order exists so references resolve to objects that already exist
Same-name handlingA resource with an existing name is skipped, and references bind to the existing objectA skip is silent success: an older connection stays, and the new job quietly uses it
Result reportSucceeded, skipped and failed counts are shown after the importRead the skipped count, not just the failures
KerberosAuthentication details are not included in the exportRe-enter the principal details after importing a connection

Cross-version imports can require manual completion when configuration is missing between the two releases, and a failed job may need editing rather than re-importing. Treat promotion as a reviewed operation with a result report, not as a copy command.

The sharp edge is the skip rule. If the archive is meant to be authoritative, clear or rename the target objects first — otherwise the environment keeps whatever older version it already had and the import reports success. That is the exact failure that makes an environment drift while every log says the deployment worked.

Known failure modes

The four mismatches that actually happen

Dual runs fail in recognisable ways. Naming them in advance turns a week of investigation into a checklist.

Common dual-run mismatches and the first check.
MismatchHow it looksWhere to look first
Type driftCounts match, values do notCompare the distinct value set of one column, not the row count
Session or timezone defaultsTimestamps shift by a fixed offsetCompare a single known row, then the session settings on both connections
Overlapping windowsCounts slightly high on the new sideCompare distinct primary-key cardinality against total rows
Identifier foldingAn object is missing, or there are two of themCheck the target engine's identifier case rules against the naming rules you applied

The first two rows account for most false confidence. Type drift and session defaults both leave the row count intact, so a team checking only counts concludes the migration worked and finds the difference in a report three weeks later. The last row is the one that looks like a platform bug and is usually a naming decision made in week one.

Cut-over, answered

Can both tools write to the same target during the dual run?

Not safely. Two writers to one table make every mismatch ambiguous, because you cannot tell which tool produced a row. Use separate targets and compare them.

How long should the dual run last?

At least one full business cycle, and it must include the period where your volume peaks. A run that only saw mid-month traffic has not been tested.

Is migration a converter that reads another tool's export?

Migration here means generating the new pipeline set from your source table list, then proving it with reconciliation and hashes. That is a repeatable method, and it does not depend on the incumbent tool exporting anything in a particular format.

What do we need before reconciliation can run?

A receipt database and receipt table, declared as a data connection. The receipt store is a MySQL database today, so decide where it lives before the dual run starts.

How do we avoid drift when promoting between environments?

Clear or rename the target objects before importing when the archive is authoritative. A same-named resource is skipped, so an older object survives a successful-looking import.

Run both tools before you commit

Start the trial alongside your current pipeline and compare the outputs on your own data.